Environmental Sustainability
St Mary’s Church Marlborough
Environmental Sustainability Policy:
1. St Mary’s PCC will endeavour to ensure that the church directs waste materials to be recycled wherever reasonably practicable.
2. St Mary’s PCC will educate and train its volunteer workers, employees and contractors not to waste resources. It will also encourage church members to invest their time and money in resource-saving at home and work.
3. St Mary’s PCC will monitor the church’s use of resources and investigate ways to reduce consumption of resources such as gas, electricity, car-fuel, water and paper.
4. St Mary’s PCC will apply for grant aid to pay for sustainability improvements where they are available and cost-effective. It will normally approve expenditure from its own reserves to reduce consumption of resources provided there is a financial payback* on expenditure within 10 years; if necessary it will borrow money to carry out such improvements. Opportunities with payback times of more than 10 years will be considered carefully, but not normally implemented unless it does not require borrowed money, and provided that other significant benefits arise.
5. Beyond projects covered by item 4 above, and apart from restrictive covenants with an instruction to spend them on sustainability, St Mary’s PCC is compelled to devote its charitable funds to its primary task of promoting the Gospel of Christ within our community and the world.
* In calculating payback time, a simple cost/return basis will be used, ignoring bank interest, because it will be assumed that utility costs rise at the same rate as bank interest rates.
ST MARY’S CHURCH & CHURCH HALL, MARLBOROUGH – Green Audit
Fossil fuel and water consumption are monitored quarterly and annual usage plotted. Fossil fuel consumption is estimated to produce:
Church about 11 tonnes of CO2 per annum.
Church Hall about 6 tonnes of CO2 per annum.
1. ST MARY’S CHURCH
1.1 Gas
We burn about 60000 kWhr of gas every year heating St Mary’s Church. The boiler is about 10 years old and is a 300,000 BTU per hour cast iron boiler with estimated efficiency of 65%.
Background heating to 4°C is programmed from October to May to prevent frost damage. Additionally we pre-heat the church to a thermostat target of 17°C for about 10 – 15 hours per week, for events when more than a handful people are at church. The program is updated on a weekly basis. The boiler produces 100 kW when firing but even so it takes several hours to raise the temperature to 17°C and if outside temperature is below 5°C it never reaches 17°C. No coat hooks are provided! The church building is the thermal equivalent of a swimming pool full of holes in the sides (like a colander) into which four large hot taps are running full bore. Once the boiler goes, off the temperature rapidly falls away over a couple of hours.
Because the ceilings are high and warmed air is more buoyant than cold air, warm air tries to escape through any leaks in the roof. When a door is open, cold air is sucked in to replace hot air leaking away and the temperature at congregation level rapidly cools. To combat this there is an inner glass door which can be kept shut whilst the outer door remains open to be welcoming. The inner door had draught-excluders fitted in 2006.
Continuously heating the church to, say, 10°C would, it is estimated, increase the gas consumption three-fold. Some churches do this.
If the boiler could be replaced by a 90% efficient condensing boiler costing about £5000, the payback time would be about 15 years. We could segregate the heating circuits into perhaps, chancel, nave and tower room to permit more effective direction of heat energy. [The tower room is heated by electric fan heaters when used as a meeting room outside of church use]. We could change the programmer to a 7-day digital temperature-timer unit that would optimise the pre-heat start-up time by monitoring the temperature in the church over several hours before the heating is needed. No net change in consumption arises but it makes the heating more consistent.
1.2 Electricity
A Saunier electric hot water heater is on continuous standby to provide instant hot water for washing. It is located under the stairs and could be put on a timer provided that times when it was not required could be predicted. It seems quite well insulated and may not draw much power when on standby.
The tower clock lighting (4 x 65 watts fluorescent) is on a 365/24 timer which adjusts for the daylight automatically.
Between three and eight welcoming lobby ceiling lights (30 Watts each) are usually on when the church is open 10 hrs/day, 7days/week. There is scope to optimise this
The altar light is on 10 hours/day for 7 days/wk. It uses 300 watts (£80 per year).
1.3 Car Fuel
Miles travelled not known but not expected to be very significant. Clergy are reimbursed. No company cars or car allowance so no incentive to drive unnecessarily. Car sharing where practicable. Public transport is used for long journey.
1.4 Waste/recycling
Considerable amounts of paper is used for weekly and monthly notice-sheets and weekly readings. There are about 8 service sheets for different festivals and standard Sundays and these sheets are re-used for several years for all relevant services.
We use the Kennett kerb-side recycling service for plastics, tins glassware & paper.
Flowers displays are arranged for most Sundays and weddings and funerals. Flower waste is collected and recycled via a church member’s garden compost heap.
“Aumbrey” 7-day candle holders cannot be recycled - the supplier will not accept empties for recycling. We could reuse if re-wicked and refilled but this would be time consuming.
2. ST MARY’S CHURCH HALL
2.1 Water (Water also goes to the church building).
Apart from a major leak in 2004, water consumption is stable.
2 disabled W/Cs < 10 years old. 2 normal W/Cs >10 years old. None seem to be low volume flush.
2.2 Hall Gas
We burn about 20000 kWhr of gas every year heating St Mary’s Church Hall. The boiler is 4 years old and is a non-condensing wall-hung boiler with estimated efficiency of 85%.
The boiler has anti-frost protection but this is thought to operate very rarely. There is no other background heating.
The hall is pre-heated from October to May according to the bookings program, updated on a weekly basis. The boiler produces 25 kW (80,000 BTU per hour.) It takes about an hour to raise the room temperature to 20°C. There are room-stats in the main hall and upstairs meeting room which are adjustable within ±1°C and sometimes left high by users. The setting are reset to 19°C on an ad hoc basis. It would be beneficial to replace with self-resetting programmable thermostats.
A 50% saving in gas has arisen from two improvement made in recent years:
- Segregating the main hall heating circuit from the upstairs room circuit
- Inserting room-stats into command wiring
- Replacing a cast iron boiler and separate ‘Ascot’ water heater by a single combi boiler.
- Installing an insulated suspended ceiling in the main hall.
- Insulating the sloping sides of the upstairs room ceiling which were un-insulated.
- Sealed unit double glazing installed in the main hall.
- Cavity wall insulation using with blown fibre to the main hall walls.
- Further segregation of the heating circuits to make the Team Office a separate circuit including 7-day programmer. [The Team Office is heated by electric heaters with poor wasteful temperature control when the main hall is not in use] Expect small increase in gas consumption but big decrease in electricity consumption.
A condensing combi boiler offer was rejected in 2004 because the non-condensing combi boiler offered was £1500 cheaper and was strongly preferred/recommended by the installer. This may have been bad advice but to change now, the payback time for a condensing combi boiler is estimated at 25 years which is not considered cost-effective until the existing boiler is life-expired or too expensive to maintain.
2.3 Hall Electricity
Electricity consumption has fallen since the Team Office was put on its own boiler circuit with its own 7 day timer, and the electric heater put into storage.
All lights are low energy, mainly strip fluorescents. One outside light is on a timer for security. Front and back doorstep lights are activated via P.I.R. detectors.
2.4 Waste/recycling
As church waste/recycling. (Section 1.4)